WORKOVER ERP
Modules
Services
Industries
Migrations
Videos
Blog
Pricing
Contact
BOOK A DEMO
Workover ERP

ERP for oil & gas service companies and machine shops — from lead to lien release, in one database.

Modules

ProcurementSales & QuotingJob RoutingMachine ShopQuality (API Q1)Financials

More modules

InventoryField TicketingTime & LaborDoc AI / OCRAI AgentsDashboardsCAD to QuoteSchedulingShipping & QCMaintenanceMarketingOperator WorkspaceMaster Data & Access

Company

PricingMigrationsIntegrationsBook a demoSchedule appointmentContact usAll modulesServicesIndustriesWhy switch

© 2026 Workover ERP. Built for Machine Shops.

MNT-16 · EQUIPMENT MAINTENANCE

MAINTENANCE THAT TALKS TO THE SCHEDULE

Workover ERP tracks preventive maintenance, repairs, calibrations, and downtime for every machine and fleet asset — and because maintenance lives in the same system as scheduling, PM windows block capacity and breakdowns re-flow the board automatically.

BOOK A LIVE DEMO▶ WATCH HOW IT WORKS (60S)
INSIDE THE PRODUCT
CAPABILITIES

WHAT'S INSIDE EQUIPMENT MAINTENANCE

MNT-16 · 01

PREVENTIVE MAINTENANCE

PM schedules by hours, cycles, or calendar — work orders generate themselves.

MNT-16 · 02

BREAKDOWN WORK REQUESTS

Operators raise requests from the floor with photos; downtime clock starts immediately.

MNT-16 · 03

CALIBRATION TRACKING

Gauges and instruments tracked with due dates — audits find nothing expired.

MNT-16 · 04

DOWNTIME & COST HISTORY

Every machine's downtime, parts, and labor cost — repair-or-replace with data.

MNT-16 · 05

FLEET ASSETS

Trucks and field units on the same PM and cost tracking as shop machines.

MNT-16 · 06

SCHEDULE INTEGRATION

PM windows block capacity on the scheduling board; breakdowns re-flow jobs.

HOW IT WORKS

EQUIPMENT MAINTENANCE IN FOUR MOVES

01

PLAN

Lathe 3 hits 500 spindle hours; its PM work order generates automatically.

02

BLOCK

The PM window blocks Thursday 6–10am on the scheduling board.

03

FIX

A grinder breakdown raises a work request from the floor — with a photo.

04

LEARN

Downtime history shows the grinder costs more than it earns; the case for replacement writes itself.

FAQ

EQUIPMENT MAINTENANCE — QUESTIONS WE GET

Does maintenance affect the production schedule?

+

Yes, automatically. PM windows block machine capacity on the scheduling board, and unplanned breakdowns re-flow affected jobs with promise-date warnings.

Can operators report problems from the floor?

+

Yes. Work requests can be raised from any shop tablet with photos and notes, and the downtime clock starts when the request is raised.

Is calibration tracking included?

+

Yes. Gauges, micrometers, and instruments carry calibration schedules and certificates — with due-date alerts so API Q1 and ISO audits find nothing expired.

Does it cover vehicles and field equipment?

+

Yes. Fleet assets run on the same PM scheduling, cost tracking, and history as shop machines.

SEE EQUIPMENT MAINTENANCE ON YOUR DATA

Wrap up with a powerful closing statement lorem test.

BOOK A LIVE DEMO

RELATED MODULES

Scheduling →Machine Shop →Quality (API Q1) →Inventory →